Roll 98 - 6 - I tighten the bolts on a post.
Roll 98 - 7 - Checking for plumb
Roll 98 - 8 - Lifting the first beam
Roll 98 - 9 - Steady
Roll 98 - 10 - Bolting it in
Roll 98 - 3 - Dad and Mike drill the last post
Roll 98 - 5 - Dropping in the second beam
Contents © Copyright 2004, Glen Hunter. All Rights Reserved.