Pictures from Sunday

| |

Well I had hoped to do an entry about Sunday sooner than this, oh well.

This Monday I gave our landlord notice that we would be moving out as of the end of May. So we're commited. The bathroom's looking pretty good, Dad got one of the doors fitted, and a good portion of the plumbing is done. We now have a toilet and a sink. Unfortunately there seems to be some issue with the water pump and we have no pressure or hot water. Simon's working on that though, and promises results before May. We met with Andrew the plumber and discussed various plumbing related issues with him. Hopefully we'll have a people bath, and a dog bath very soon. The shower won't be installed for a couple more months as the shower base was a special order and might not be in until June.

The major to-do list now consists of kitchen cabinets, final stucco, drywalling, and sanding/sealing the posts.

Here are the pictures from Sunday

0 TrackBacks

Listed below are links to blogs that reference this entry: Pictures from Sunday.

TrackBack URL for this entry: http://www.glenhunter.ca/cgi-bin/mt-tb.cgi/224

1 Comments

Hello

My husband & I are going to build our own home in the mountains. There is no power, water or sewer. I am looking for any information that will help us in this adventure. I also need to mention that there is not a whole lot of money to work with. We are also looking for help in building homemade power. Any information you can provide would be greatly appreciated.

Thank you

Lori & Tom

Leave a comment

Contact Us

Twitter Status

Amazon Wishlist

Powered By

Powered by Movable Type 4.261

Google Ads